Inland Rail Narrabri to North Star full steam ahead
Construction is full steam ahead on Inland Rail with Federal Member for Parkes Mark Coulton thrilled the last load of concrete sleepers and rail had been delivered for the Narrabri to North Star (N2NS) section. A total of 21 trains have delivered 2,474 165-metre long lengths (a total of 24,775 tonnes) of steel from OneSteel…
Details